|
|
|
|
LEADER |
02835nam a22004095i 4500 |
001 |
000277422 |
005 |
20211026184533.0 |
007 |
cr nn 008mamaa |
008 |
100301s2008 xxk| s |||| 0|eng d |
020 |
|
|
|a 9781848002258
|
024 |
7 |
|
|a 10.1007/978-1-84800-225-8
|2 doi
|
040 |
|
|
|a Sistema de Bibliotecas del Tecnológico de Costa Rica
|
245 |
1 |
0 |
|a Build To Order :
|b The Road to the 5-Day Car /
|c edited by Glenn Parry, Andrew Peter Graves.
|
250 |
|
|
|a 1st ed. 2008.
|
260 |
# |
# |
|a London :
|b Springer London :
|b Imprint: Springer,
|c 2008.
|
300 |
|
|
|a XX, 438 p. :
|b online resource.
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
505 |
0 |
|
|a and Overview -- and Overview -- Industry Dynamics -- The Evolution of Competition in the Automotive Industry -- Build-to-Order: Impacts, Trends and Open Issues -- Current Issues at OEMs and Suppliers -- Outsourcing: Management and Practice Within the Automotive Industry -- Modularity -- An Overview of Modular Car Architecture: the OEMS Perspective on Why and How -- The Modular Body -- Modular Concepts and the Design of the ModCar Body Shell -- Complexity Cost Management -- Collaboration -- Key Principles of Flexible Production and Logistics Networks -- Collaborative Planning Processes -- Collaborative Execution Processes -- Functionalities of Supporting IT Systems: Current Situation, Future Requirements and Innovative Approaches -- Modelled Scenario Examples for Planning and Execution Processes -- Validation -- A BTO Reference Model for High-Level Supply Chain Design -- Rapid Supply Chain Design by Integrating Modelling Methods -- Moving Towards BTO – An Engine Case Study -- How the Electro-Mechanical Valve Train Accelerates Logistics and Reduces Costs -- Network Design for Build-to-Order Automotive Production -- Implementation -- Automotive e-hubs: Exploring Motivations and Barriers to Collaboration and Interaction -- Automotive Supplier Park Strategies Supporting Build-to-Order -- Managing the Transition to the “5-Day Car” in Europe -- The Road Ahead -- The Road to the 5-Day Car.
|
650 |
|
0 |
|a Automotive engineering.
|
650 |
|
0 |
|a Engineering economics.
|
650 |
|
0 |
|a Engineering economy.
|
650 |
|
0 |
|a Industrial engineering.
|
650 |
|
0 |
|a Production engineering.
|
650 |
|
0 |
|a Production management.
|
650 |
|
0 |
|a Management.
|
650 |
|
0 |
|a Industrial management.
|
650 |
1 |
4 |
|a Automotive Engineering.
|
650 |
2 |
4 |
|a Engineering Economics, Organization, Logistics, Marketing.
|
650 |
2 |
4 |
|a Industrial and Production Engineering.
|
650 |
2 |
4 |
|a Operations Management.
|
650 |
2 |
4 |
|a Innovation/Technology Management.
|
700 |
1 |
|
|a Parry, Glenn.
|e editor.
|
700 |
1 |
|
|a Graves, Andrew Peter.
|e editor.
|
710 |
2 |
|
|a SpringerLink (Online service)
|
773 |
0 |
|
|t Springer eBooks
|