|
|
|
|
LEADER |
01743nam a22003615i 4500 |
001 |
000292626 |
005 |
20220317152632.0 |
007 |
cr nn 008mamaa |
008 |
100301s2009 xxk| s |||| 0|eng d |
020 |
|
|
|a 9781848827912
|
024 |
7 |
|
|a 10.1007/978-1-84882-791-2
|2 doi
|
040 |
|
|
|a Sistema de Bibliotecas del Tecnológico de Costa Rica
|
100 |
1 |
|
|a Park, Jinkyun.
|e author.
|
245 |
1 |
4 |
|a The Complexity of Proceduralized Tasks /
|c by Jinkyun Park.
|
250 |
|
|
|a 1st ed. 2009.
|
260 |
# |
# |
|a London :
|b Springer London :
|b Imprint: Springer,
|c 2009.
|
300 |
|
|
|a XXIV, 189 p. :
|b online resource.
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
490 |
1 |
|
|a Springer Series in Reliability Engineering,
|
505 |
0 |
|
|a Foundation -- Complexity of Proceduralized Tasks -- Significant Complexity Factors -- Complexity Evaluation -- to Software Complexity -- Emergency Tasks Prescribed in the EOPs of NPPs -- Analyzing the Required Actions Prescribed in Emergency Tasks -- Quantifying the Contribution of Task Complexity Factors -- Integrating the Contribution of Each Complexity Factor -- Validation of TACOM Measure -- Promising Applications and Outlook -- Promising Applications -- Concluding Remarks with Outlook.
|
650 |
|
0 |
|a Quality control.
|
650 |
|
0 |
|a Reliability.
|
650 |
|
0 |
|a Industrial safety.
|
650 |
|
0 |
|a Manufactures.
|
650 |
|
0 |
|a Engineering economics.
|
650 |
|
0 |
|a Engineering economy.
|
650 |
1 |
4 |
|a Quality Control, Reliability, Safety and Risk.
|
650 |
2 |
4 |
|a Manufacturing, Machines, Tools, Processes.
|
650 |
2 |
4 |
|a Engineering Economics, Organization, Logistics, Marketing.
|
710 |
2 |
|
|a SpringerLink (Online service)
|
773 |
0 |
|
|t Springer eBooks
|