|
|
|
|
| LEADER |
01631nam a22003855i 4500 |
| 001 |
978-1-4419-1014-1 |
| 005 |
20191029011303.0 |
| 007 |
cr nn 008mamaa |
| 008 |
100301s2009 xxu| s |||| 0|eng d |
| 020 |
|
|
|a 9781441910141
|
| 024 |
7 |
|
|a 10.1007/978-1-4419-1014-1
|2 doi
|
| 040 |
|
|
|a Sistema de Bibliotecas del Tecnológico de Costa Rica
|
| 100 |
1 |
|
|a Vanhoucke, Mario.
|e author.
|
| 245 |
1 |
0 |
|a Measuring Time
|b Improving Project Performance Using Earned Value Management /
|c by Mario Vanhoucke.
|
| 250 |
|
|
|a 1st ed. 2009.
|
| 260 |
# |
# |
|a New York, NY :
|b Springer US :
|b Imprint: Springer,
|c 2009.
|
| 300 |
|
|
|a XXX, 164 p. 73 illus.
|b online resource.
|
| 336 |
|
|
|a text
|b txt
|2 rdacontent
|
| 337 |
|
|
|a computer
|b c
|2 rdamedia
|
| 338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
| 490 |
1 |
|
|a International Series in Operations Research & Management Science,
|v 136
|
| 505 |
0 |
|
|a The EVM Fundamentals -- Beyond the EVM Fundamentals -- A Case Study -- A Simulation Study -- Time Sensitivity -- Top-down or Bottom-up Project Tracking -- ProTrack: A Software Tutorial -- Conclusions.
|
| 650 |
|
0 |
|a Industrial engineering.
|
| 650 |
|
0 |
|a Production engineering.
|
| 650 |
|
0 |
|a Operations research.
|
| 650 |
|
0 |
|a Decision making.
|
| 650 |
|
0 |
|a Building-Superintendence.
|
| 650 |
|
0 |
|a Construction industry-Management.
|
| 650 |
|
0 |
|a Construction superintendence.
|
| 650 |
1 |
4 |
|a Industrial and Production Engineering.
|
| 650 |
2 |
4 |
|a Operations Research/Decision Theory.
|
| 650 |
2 |
4 |
|a Construction Management.
|
| 710 |
2 |
|
|a SpringerLink (Online service)
|
| 773 |
0 |
|
|t Springer eBooks
|
| 856 |
4 |
0 |
|u https://doi.org/10.1007/978-1-4419-1014-1
|