|
|
|
|
LEADER |
00903nam a2200205 u 4500 |
001 |
000328449 |
005 |
20110720143301.0 |
008 |
s1964 s1964 xx ||||| eng |
035 |
|
|
|a 118010
|
040 |
|
|
|a Sistema de Bibliotecas de la Universidad de Costa Rica
|
041 |
0 |
|
|a eng
|
082 |
0 |
|
|a 621.48
|b D946sh
|2 00
|
110 |
2 |
|
|a Duquesne Light Company
|e Autor/a
|4 aut
|
245 |
1 |
0 |
|a Shippingport operations from power operation after second reflueling to power operation after third reflueling, October 24, 1961 to January 30, 1963 /
|c prepared Duquesne Light Company and Bettis Atomic Power Laboratory. --
|
260 |
|
|
|a [Lugar de publicación no identificado] :
|b The Company,
|c 1964.
|
300 |
|
|
|a cerca de 200 páginas :
|b ilustraciones
|
650 |
|
|
|a CENTRALES NUCLEOELECTRICAS
|x ESTADOS UNIDOS
|
710 |
2 |
|
|a Bettis Atomic Power Laboratory, Pittsburgh
|e Autor/a
|4 aut
|
949 |
|
|
|a -AG. b PCH.
|
916 |
|
|
|a Registros del LS-2000
|