Shippingport operations from power operation after second reflueling to power operation after third reflueling, October 24, 1961 to January 30, 1963 /

Detalles Bibliográficos
Autores Corporativos: Duquesne Light Company (Autor, Autor/a), Bettis Atomic Power Laboratory, Pittsburgh (Autor, Autor/a)
Formato: Libro
Lenguaje:English
Publicado: [Lugar de publicación no identificado] : The Company, 1964.
Materias:
LEADER 00903nam a2200205 u 4500
001 000328449
005 20110720143301.0
008 s1964 s1964 xx ||||| eng
035 |a 118010 
040 |a Sistema de Bibliotecas de la Universidad de Costa Rica 
041 0 |a eng 
082 0 |a 621.48  |b D946sh  |2 00 
110 2 |a Duquesne Light Company  |e Autor/a  |4 aut 
245 1 0 |a Shippingport operations from power operation after second reflueling to power operation after third reflueling, October 24, 1961 to January 30, 1963 /  |c prepared Duquesne Light Company and Bettis Atomic Power Laboratory. -- 
260 |a [Lugar de publicación no identificado] :  |b The Company,  |c 1964. 
300 |a cerca de 200 páginas :  |b ilustraciones 
650 |a CENTRALES NUCLEOELECTRICAS  |x ESTADOS UNIDOS 
710 2 |a Bettis Atomic Power Laboratory, Pittsburgh  |e Autor/a  |4 aut 
949 |a -AG. b PCH. 
916 |a Registros del LS-2000