|
|
|
|
| LEADER |
01003nam a2200241 a 4500 |
| 001 |
000695005 |
| 005 |
20240404092212.0 |
| 008 |
230306s2006 dcuao gr ||||||eng d |
| 020 |
|
|
|a 0821366823
|
| 020 |
|
|
|a 9780821366820
|
| 040 |
|
|
|a Sistema de Bibliotecas de Universidad de Costa Rica
|
| 100 |
1 |
|
|a Mazzei, Leonardo
|e Autor/a
|
| 245 |
1 |
3 |
|a The role of communication in large infrastructure :
|b the Bumbuna Hydroelectric Project in post-conflict Sierra Leone /
|c Leonardo Mazzei, Gianmarco Scuppa.
|
| 260 |
|
|
|a Washington, D.C. :
|b The World Bank,
|c c2006.
|
| 300 |
|
|
|a ix, 42 páginas :
|b ilustraciones en blanco y negro, fotografías en blanco y negro.
|
| 490 |
0 |
|
|a World Bank working paper
|v No. 84
|
| 650 |
0 |
7 |
|a INFRAESTRUCTURA (ECONOMIA)
|z SIERRA LEONA
|
| 610 |
2 |
7 |
|a Proyecto Hidroeléctrico Bumbuna (Sierra Leona)
|
| 650 |
0 |
7 |
|a COMUNICACION EN DESARROLLO RURAL
|z SIERRA LEONA
|
| 700 |
1 |
|
|a Scuppa, Gianmarco
|d 1967-
|e Autor/a
|
| 900 |
|
|
|a 2024-O
|
| 916 |
|
|
|a Centro Catalográfico
|
| 949 |
|
|
|a MELS -AEM
|