Estimating construction cost and schedules : experience with power generation projects in developing countries /

Detalles Bibliográficos
Formato: Libro
Lenguaje:English
Publicado: Washington, D.C. : The World Bank, 1996.
Colección:World Bank technical paper no. 325
LEADER 00595nam a2200133 a 4500
001 000701706
005 20240124131641.0
008 230620s1996 dcua gr ||||||eng d
040 |a Sistema de Bibliotecas de la Universidad de Costa Rica 
245 1 0 |a Estimating construction cost and schedules :  |b experience with power generation projects in developing countries /  |c Robert W. Bacon, John E. Besant-Jones, and Jamshid Heidarian. 
260 |a Washington, D.C. :  |b The World Bank,  |c 1996. 
300 |a xv, 120 páginas :  |b ilustraciones en blanco y negro. 
490 0 |a World Bank technical paper  |v no. 325 
949 |a -AEM