|
|
|
|
LEADER |
01145nam a2200169 a 4500 |
008 |
050201s1965||||xxu|||||||||||||||||eng|| |
942 |
|
|
|c BK
|
082 |
|
|
|a 519.72
|b S525c
|
100 |
|
|
|a Shaffer, L. R.
|
245 |
0 |
0 |
|a The Critical Path Method /
|c L.R. ShafferJ. B. RitterW. L. Meyer.
|
260 |
|
|
|a New York :
|b McGraw-Hill Book Company, Inc.,
|c 1965
|
300 |
|
|
|a 216 p.
|
592 |
|
|
|a I. IntroductionII. CPM-I and The Arrow NetworkIII. CPM-I_Calculations on the NetworkIV. UpdatingV. Operation Definitions in PracticeVI. Remarks on Analysis of the NetworkVII. Resource Scheduling: CPM-IVIII. An Application of CPM-IIX. CPM-IIX. The Digital Computer in CPM-I and IIXI. CPM Today and Tomorrow
|
999 |
|
|
|c 92824
|d 92824
|
952 |
|
|
|0 0
|1 0
|4 0
|6 519_720000000000000_S525C
|7 0
|8 CG
|9 168085
|a 15
|b 15
|c CG
|d 2012-08-15
|i 15001167
|o 519.72 S525c
|p 15001167
|r 2012-08-15
|t 1
|w 2012-08-15
|y BK
|
952 |
|
|
|0 0
|1 0
|4 0
|6 658_511000000000000_S525
|7 0
|8 CG
|9 168086
|a 15
|b 15
|c CG
|d 2012-08-15
|i 15005207
|o 658.511 S525
|p 15005207
|r 2012-08-15
|t 2
|w 2012-08-15
|y BK
|
952 |
|
|
|0 0
|1 0
|4 0
|6 658_511000000000000_S525
|7 0
|8 CG
|9 168087
|a 15
|b 15
|c CG
|d 2012-08-15
|i 15005208
|o 658.511 S525
|p 15005208
|r 2012-08-15
|t 3
|w 2012-08-15
|y BK
|