|
|
|
|
LEADER |
00913nam a2200169 a 4500 |
008 |
050201s1934||||xxu|||||||||||||||||eng|| |
082 |
0 |
|
|a 526.9
|b T761p
|
100 |
1 |
|
|a Clayton Tracy, John
|
245 |
1 |
0 |
|a Plane Surveying /
|c John Clayton Tracy.
|
260 |
|
|
|a New York :
|b John Wiley & Sons, Inc.,
|c 1934
|
300 |
|
|
|a 888 p.
|
592 |
|
|
|a I. Introduction. Fundamental Principles and General MethodsV. Errors in Linear MeasurementsX. Errors in Angular MeasurementsXV. Transit Surveying_Field NotesXX. Leveling-TheoryXXV. Stadia SurveyingXXX. Calculation of BearingXXXV. Earthwork ComputationsXL. Working-up Field Notes Preparatory to PlottingXLV. Surveying InstrumentsXLVII. The Care of Instruments
|
991 |
|
|
|a No asignado
|
992 |
|
|
|a 22/07/2009
|
942 |
|
|
|c BK
|
999 |
|
|
|c 92876
|d 92876
|
952 |
|
|
|0 0
|1 0
|4 0
|6 526_900000000000000_T761P
|7 0
|8 CG
|9 168166
|a 15
|b 15
|c CG
|d 2012-08-15
|i 15001288
|o 526.9 T761p
|p 15001288
|r 2012-08-15
|t 1
|w 2012-08-15
|y BK
|