|
|
|
|
LEADER |
01569nam a2200421 a 4500 |
008 |
050201s1915||||xxua |||||||||||||eng|| |
041 |
0 |
|
|a eng
|
082 |
0 |
|
|a 628.2
|b M576
|
100 |
0 |
|
|a Metcalf, Leonard
|
245 |
0 |
0 |
|a American Sewerage Practice. V.2 Construction of Sewers /
|c Leonard Metcalf.
|
250 |
|
|
|a 2a ed.
|
260 |
|
|
|a New York :
|b McGraw Hill,
|c 1915
|
300 |
|
|
|a x, 564 p. ;
|b Il.
|
650 |
|
|
|a DESAGšES CLOACALES
|
592 |
|
|
|a Preliminary Investigations
|
592 |
|
|
|a Engineering Work and Inspections During Construction
|
592 |
|
|
|a Excavation
|
592 |
|
|
|a Machinery for Trench Excavation
|
592 |
|
|
|a Methods of Rock Excavation
|
592 |
|
|
|a Explosive and Blasting
|
592 |
|
|
|a Quantity and Cost of Excavation
|
592 |
|
|
|a Rate of Progress in Building SEwers
|
592 |
|
|
|a The Sheeting and Bracing of Trenches and Tunnels
|
592 |
|
|
|a Sizes of Sheeting, and Braces
|
592 |
|
|
|a Purchasing, Handling and Laying Sewer Pipe
|
592 |
|
|
|a Jointing Sewer Pipe
|
592 |
|
|
|a Construction of Brick and Block Sewers
|
592 |
|
|
|a Construction of Concrete Sewers
|
592 |
|
|
|a Profile, Template, form and Centers
|
592 |
|
|
|a Contracts, Secifications and Drawings
|
592 |
|
|
|a Technical Specifications
|
592 |
|
|
|a Operation and Maintenance of Sewerage Systems
|
592 |
|
|
|a Explosions in Sewers
|
991 |
|
|
|a No asignado
|
992 |
|
|
|a 07/09/2009
|
942 |
|
|
|c BK
|
999 |
|
|
|c 94652
|d 94652
|
952 |
|
|
|0 0
|1 0
|4 0
|6 628_200000000000000_M576
|7 0
|8 CG
|9 171391
|a 15
|b 15
|c CG
|d 2012-08-15
|i 15004584
|o 628.2 M576
|p 15004584
|r 2012-08-15
|t 1
|w 2012-08-15
|y BK
|