|
|
|
|
| LEADER |
00778nam a2200193 a 4500 |
| 008 |
050201s1964||||xxua |||||||||||||eng|| |
| 942 |
|
|
|c BK
|
| 041 |
|
|
|a eng
|
| 082 |
|
|
|a 658.5082
|b D691p
|
| 100 |
|
|
|a Dooley, Ar.
|
| 245 |
0 |
0 |
|a Production operating decisions in the total business strategy. /
|c Arch Dooley.
|
| 260 |
|
|
|a New York :
|b John Wiley & Sons,Inc.,
|c 1964
|
| 300 |
|
|
|a 427 p. ;
|b il.
|
| 650 |
|
|
|a ADMINISTRACION INDUSTRIAL-ESTUDIO DE CASOS
|
| 592 |
|
|
|a Over-hall assesment and determination of action requeriments
|
| 592 |
|
|
|a Responses to specific problems
|
| 592 |
|
|
|a Foreing production operations
|
| 999 |
|
|
|c 95070
|d 95070
|
| 952 |
|
|
|0 0
|1 0
|4 0
|6 658_508200000000000_D691P
|7 0
|8 CG
|9 172142
|a 15
|b 15
|c CG
|d 2012-08-15
|i 15005192
|o 658.5082 D691p
|p 15005192
|r 2012-08-15
|t 1
|w 2012-08-15
|y BK
|