guide to Cost Reduction through Critical Path Scheduling /

Detalles Bibliográficos
Autor principal: Riggs, James L.
Formato: Libro
Lenguaje:English
Publicado: Englewood Cliffs, N.J. : PRENTICE-HALL, INC., 1963
Materias:
LEADER 01159nam a2200289 a 4500
008 050201s1963||||xxua |||||||||||||eng||
942 |c BK 
041 |a eng 
082 |a 658.511  |b R569  
100 |a Riggs, James L. 
245 0 0 |a guide to Cost Reduction through Critical Path Scheduling /  |c James L. Riggs. 
260 |a Englewood Cliffs, N.J. :  |b PRENTICE-HALL, INC.,  |c 1963 
300 |a 216 p. ;  |b il. 
650 |a RUTA CRITICA, ANALISIS DE LA 
650 |a COSTO DE PRODUCCION 
592 |a fundamentals of Critical Path Scheduling 
592 |a Setting Up the Project Plan 
592 |a Details Involved in Project Plan Development 
592 |a Determining the Critical Path 
592 |a Reading and Constructing time Charts 
592 |a Calculating Boundary Times by the Matrix Method 
592 |a Putting the time Chart to Work on a Project 
592 |a Analyzing Project Costs by CPS 
592 |a Controlling the Project with CPS 
592 |a Decision Makeng with CPS 
999 |c 95077  |d 95077 
952 |0 0  |1 0  |4 0  |6 658_511000000000000_R569  |7 0  |8 CG  |9 172153  |a 15  |b 15  |c CG  |d 2012-08-15  |i 15005206  |o 658.511 R569  |p 15005206  |r 2012-08-15  |t 1  |w 2012-08-15  |y BK