|
|
|
|
LEADER |
00778nam a2200241 a 4500 |
001 |
000000041952 |
003 |
OSt |
005 |
20161012133931.0 |
008 |
161012b sp ||||| |||| 00| 0 spa d |
020 |
|
|
|a 84-252-0398-8
|
040 |
|
|
|a Sistema de Bibliotecas UNAH
|
082 |
0 |
|
|a 690.0285-W13
|
100 |
1 |
|
|a Wagner, Gerhard
|
245 |
1 |
0 |
|a Los Sistemas de planificación CPM Y pert aplicados a la construcción
|c Gerhard Wagner
|
260 |
|
|
|c 1979
|a Barcelona
|b Gustavo Gili
|
300 |
|
|
|a 149 p., 1 h. plegs.
|b il.
|c 21 cm.
|
504 |
|
|
|a Bibliografía: p. 149
|
650 |
|
4 |
|a INVESTIGACIÓN OPERATIVA
|
650 |
|
4 |
|a MÉTODO PERT
|
650 |
|
4 |
|a MÉTODO CPM
|
942 |
|
|
|2 ddc
|c LB
|
999 |
|
|
|c 41952
|d 41952
|
952 |
|
|
|0 0
|1 0
|2 ddc
|4 0
|6 690_000000000000000_0285W13
|7 0
|9 129784
|a CG
|b BC
|l 0
|o 690.0285-W13
|p 409798
|y LB
|