|
|
|
|
LEADER |
01073nam a2200397 i 4500 |
007 |
ta |
040 |
|
|
|a Universidad Nacional Agraria
|b spa
|
907 |
|
|
|a E50
|
911 |
|
|
|a M
|
978 |
|
|
|a IA
|
979 |
|
|
|a 17-10-2011
|
991 |
|
|
|a TEXTO
|
991 |
|
|
|a I17-10-11
|
020 |
|
|
|a ISBN: 9972-9486-1-7
|
035 |
|
|
|a 031923
|
041 |
|
|
|a spa
|
092 |
|
|
|a E50 R628
|
100 |
1 |
|
|a Rojas Moran, L. M.
|
245 |
1 |
0 |
|a Enfoques e instrumentos metodologicos para la promocion municipal del desarrollo economico local
|
260 |
|
|
|a Lima (Peru) :
|b ,
|c 2004
|
264 |
|
|
|a Lima (Peru) :
|b ,
|c 2004
|
300 |
|
|
|a 188 p.
|
500 |
|
|
|a Ilus.
|
650 |
|
7 |
|a DESARROLLORURAL
|
650 |
|
7 |
|a GOBIERNO LOCAL
|
650 |
|
7 |
|a PROYECTOS DE DESARROLLO
|
650 |
|
7 |
|a EMPRESAS EN PEQUEÑA ESCALA
|
650 |
|
7 |
|a DESARROLLO ECONOMICO
|
650 |
|
7 |
|a GESTION
|
650 |
|
7 |
|a CAPACITACION RURAL
|
650 |
|
7 |
|a PLANES DE DESARROLLO
|
650 |
|
7 |
|a PLANIFICACION DE PROYECTOS
|
650 |
|
7 |
|a DIRECTORIOS
|
650 |
|
7 |
|a DIAGNOSTICO RURAL RAPIDO
|
942 |
|
|
|c BK
|2 agris
|
952 |
|
|
|a 01
|b 01
|8 CG
|c CG
|y BK
|p L0974/11
|o E50 R628
|